The Wall Work
Another important thing to be taken care of were the walls, that were actually done before placing the ceiling at the right position. As the ceiling was curved, it was increasing their difficulty to fit in the studs. The couple was giving day and nights to the work as the date for their competition was approaching.
Fun With Furniture
The work was going great, they were meeting all the timelines, yet they assigned a specific number of days for each task to be completed. So far, they were able to achieve all their targets. But the fact was they cannot bring the bus to action unless the insurance is done.
The Solar Power Work
The roof is round in shape and it was another challenge to fix solar panels on top of it. But as long as the two were determined they were finding out solutions for all the problems coming on their ways. And hence they ended up customizing the rooftop in order to fix the solar panels which helps in providing energy to the bus.
Major Construction
Another weekend passed away in completing the bathroom and water system; hooking up the power; adding appliances; and finishing benches, shelves, doors, and desks. Step by step, they were getting everything done.
Getting Things Done
Painting and paneling the walls, attaching countertops, and replacing the driver’s seat was done. They were able to finish the complete work by the end of the July and at the same time, Will had a special thing for his girlfriend. Which gave their lives the best twist and gave them much more to look ahead for.
Approved
They finally got an insurance cover for their new home according to their conditions. Also, the bus was accepted as a residence and everything about it just seemed to be so perfect that they instantly started moving into their new place.